The "Schlitzerländer Burgenbad" was handed over to the client for use on May 3, 2024. The extensive overall renovation of the outdoor swimming pool in Schlitz was carried out in three construction phases from 2021 to ensure operation in the summer months. The sports and swimming pool was given an interior lining made of stainless steel including a surrounding overflow channel. Furthermore, the entire pool water and heating technology, including connecting pipes to the pools, was replaced and a new kiosk was built.